2. Operational Redesign Accelerators¶
1. Purpose¶
These accelerators speed up the execution of the Operational Redesign track. They provide ready-to-use frameworks for process analysis, prioritisation and implementation planning.
2. Accelerator: Process Scorecard¶
Use this format to evaluate processes on AI suitability. Score each criterion from 1 (low) to 3 (high).
| Criterion | Score (1–3) | Notes |
|---|---|---|
| Repeatability | How often is this process executed? | |
| Data richness | Is sufficient historical data available? | |
| Rule-based | Are decisions based on clear rules? | |
| Error-proneness | How often do errors occur in the current process? | |
| Time-intensity | How many hours per week does this process cost? | |
| Low error impact | Are AI errors recoverable without major damage? |
Total score: Sum of all scores (max. 18). Processes with score ≥ 12 are strong candidates.
3. Accelerator: AI Process Redesign Template¶
Use this format for each selected process before implementation:
Current State ('As-Is')¶
- Process name: [name]
- Process owner: [name + role]
- Frequency: [daily / weekly / per request]
- Steps: [list the steps as a numbered list]
- Current KPI: [e.g. 45 min/document, 8% error rate]
- Bottlenecks: [what costs the most time or causes the most errors?]
Desired State ('To-Be')¶
- Role of AI: [which steps does AI take over or support?]
- Role of human: [what does the employee still do?]
- Collaboration mode: [Mode 2 / 3 / 4 — see AI Collaboration Modes]
- KPI target value: [e.g. 10 min/document, \<2% error rate]
- Hard Boundaries: [which decisions may AI never make independently?]
Baseline Measurement¶
| KPI | Current value | Target value | Measurement method |
|---|---|---|---|
| [KPI 1] | |||
| [KPI 2] |
4. Accelerator: Implementation Sprint Plan¶
Divide the implementation into four two-week sprints:
| Sprint | Week | Goal | Deliverables |
|---|---|---|---|
| Sprint 1 | 1–2 | Build & internal testing | Working basic version + internal test report |
| Sprint 2 | 3–4 | User pilot (small group) | Pilot feedback + first measurements |
| Sprint 3 | 5–6 | Adjust & expand | Improved version + broader pilot group |
| Sprint 4 | 7–8 | Scale & embed | Production version + process description + monitoring live |
Go/No-Go after Sprint 2: If pilot results are not moving towards target values, stop and analyse the cause before Sprint 3.
5. Accelerator: Adoption Plan¶
Technology alone is not enough — adoption determines success.
| Phase | Activity | Owner |
|---|---|---|
| Awareness | Communication about the 'why' of the change | AI PM + Management |
| Training | Hands-on session in the new way of working (not just the tool) | Tech Lead + HR |
| Guidance | Buddy system: experienced users help new users | Process owner |
| Measurement | Weekly check-in: how is usage going? | AI PM |
| Embedding | Include KPIs in regular performance conversations | Management |
6. Related Modules¶
- Accelerators — Overview
- Operational Redesign
- Quick Start: AI Project in 90 Days
- Metrics & Dashboards
- Benefits Realisation — Operational
Was this page helpful?
Give feedback