1. Checklist: Operational Handover¶
Purpose
Tick-off checklist for the formal handover of the AI system from the project team to the operations organisation at Gate 4.
Use this checklist for the formal handover of the AI system from the project team to the operations organisation (Gate 4 — Go-live). All items must be ticked and documented before the handover is officially complete.
1. Technical Readiness¶
- Model documentation complete: Technical Model Card is completed and approved by the Guardian.
- Code repository delivered: All source code, configurations and model definitions are in a repository accessible to the operations organisation (version control).
- Environment documentation in place: Infrastructure requirements (compute, storage, network, access rights) are documented.
- Runbook available: Step-by-step guide for daily operation, restart procedures and scaling has been written and tested by the operations organisation.
- Monitoring active: Dashboards, alerts and thresholds are set up and visible to the operations team.
- Logging configured: Input/output logging is active in line with the requirements of the risk level (minimum 30 days retention for Limited Risk, 12 months for High Risk).
2. Operational Readiness¶
- Operations team assigned: There is a designated owner (Accountable) for the system in the operations organisation.
- Escalation path defined: Incident procedures are documented: who to contact, when, how? → Incident Response
- SLOs established: Service norms (latency, availability, accuracy threshold) have been agreed in writing between the project team and the operations organisation.
- Retraining protocol documented: When and how is the model retrained? Who may initiate this?
- Baseline recorded: Baseline performance (accuracy, latency, usage costs) has been measured and documented as a reference for future performance degradation monitoring.
3. Governance & Compliance¶
- Guardian transferred: The Guardian role has been formally transferred to a person within the operations organisation or an independent party.
- Hard Boundaries communicated: The operations organisation knows and understands the system's Hard Boundaries. Written confirmation in place.
- EU AI Act dossier complete: For High Risk systems, the Technical Dossier is complete and approved by the Guardian. → EU AI Act
- Privacy & Data compliant: Data & Privacy Sheet (GDPR/DPIA) is approved and included in the dossier.
- Licences and contracts arranged: All external API contracts, data licences and vendor agreements have been transferred to the operations organisation.
4. Knowledge Transfer¶
- User training completed: End users are trained. Training materials are available and up to date.
- Administrator training completed: Technical operations team has had a hands-on session with the MLOps engineer from the project team.
- Lessons Learned transferred: Insights from the project are documented and available for future projects. → Lessons Learned
- Contact list delivered: Names and contact details of data providers, model vendors and technical contacts have been transferred.
5. Formal Closure¶
- Handover acceptance signed: Project team and operations organisation have signed the handover form.
- Gate 4 (Go-live) approved: All Gate Review criteria are ticked and documented. → Gate Reviews
- Benefit realisation plan activated: The plan for measuring realised benefits has been transferred to the owner in the operations organisation. → Benefit Realisation
- Project archive closed: All project documents are archived at the agreed location.
Signatures¶
| Role | Name | Date | Signature |
|---|---|---|---|
| Project Lead (AI PM) | |||
| Tech Lead | |||
| Guardian | |||
| Operations Organisation Owner |
Related modules:
Next step: Complete this checklist together with the operations team before the formal handover → See also: Gate 4 | Phase 5 Monitoring