1. Delivery¶
Purpose
Objectives of Phase 4: a safe go-live, human oversight and structured handover to the production environment.
1. Delivery Objectives¶
- Safe Go-live: Controlled transition to production.
- Human Oversight: Ensuring that users understand the system and can intervene.
- Human-in-the-Loop Culture: Embed structured human review points at critical stages — from data labelling through model validation to production monitoring. Teams integrate human judgement where AI confidence is low or stakes are high, following the Collaboration Mode assigned to the project.
- Red Button Culture: Employees are rewarded for reporting errors; psychological safety is central.
- Expert Oversight: The AI assists, but the human retains final responsibility.
Key result: An operational AI system that is technically integrated, humanly controlled and broadly accepted by users.
2. Entry Criteria (Definition of Ready)¶
Before this phase starts, the following conditions must be met:
- The Development phase is completed (Gate 3 (Production-Ready) approved).
- All automated tests have passed.
- The infrastructure for Go-live is ready.
- The implementation team is on standby.
3. Related Modules¶
Templates for this phase:
Further reading:
Next step: ➡ Phase 5: Monitoring & Optimisation